Before you schedule the rebuild
A typical turnover sequence
Durations vary widely; this shows order, not timing.
- Cleanup complete
- Provider finishes removal, disinfection and sealing. Keep the unit closed and ventilated.
- Odor check
- Wait several days with normal heating or cooling, then check again before covering anything.
- Rebuild
- Replace subfloor, flooring, drywall, trim and fixtures as needed. Pull permits where your city requires them for the work involved.
- Make-ready
- Paint, rekey locks, test smoke and carbon monoxide alarms, replace HVAC filters and clean as for any turnover.
- Final inspection
- Walk the unit with fresh eyes or ask a colleague who has not been involved to check it.
- Listing
- Market the unit as you normally would.
Questions to settle with your team
- Who on staff will answer neighbor questions, and what will they say?
- Do the neighboring tenants need a brief notice about work in the building?
- Should the unit file include the cleanup documentation, and who can see it?
- Does loss-of-rent coverage apply, and what proof does the insurer need?
- Were any building systems, such as shared ventilation or plumbing, involved in a way that needs a separate check?
- Is there anything about the situation that should change how welfare checks are handled in the future?
Common questions
- Should the unit sit empty for a period of time?
- There is no health reason to wait once cleanup is verified and repairs are done. Some owners choose a short pause out of respect; that is a personal decision.
- Who should pay for the rebuild after cleanup?
- Often the landlord policy responds to the building materials, subject to the deductible and the cause of loss. Whether any cost can be recovered from a tenant or an estate is a question for your attorney, not something to deduct from a deposit without advice.
General information for the Denver area, not a quote or professional advice. In an emergency, call 911.